Project management

Our process of Product Engineering allows us to mesh the talent of our people with the latest technology to yield a robust manufacturing design that will deliver product to our customer which:

  1. Meets and/or exceeds their performance expectations
  2. Minimizes their time to market
  3. Reduces PPM’s
  4. Reduces their cost

Customer RFQ

Request for offer with product drawings, samples or just concept.

Offer

submit quotation within 2 days

Order Confirmation

Project kicks off upon SWIFT of deposit

Layout Assembly Drawing

2 to 4 days for layout drawings

Detailed Design

Mold components with detail drawings.

Drawings Final Confirmation

Drawings are finally confirmed by customer

Schedule

Follow up the schedule

Mould Manufacture

Mould manufacture on schedule

Mould Trial Running and Samples Submitted

Mould trial running on schedule, and Samples are submitted with a detailed inspection report

Sample Confirmation

After inspected final samples according to specifications customer make a confirmation.

Packing

tooling finished and packed

Delivery

Paperwork and a CD of all drawings are sent to customer at the time of the goods shipping.