AE mould quality control starts at the beginning of each project. We are certified and committed to the comprehensive ISO 9001 quality system standard.
Our systems, equipment and staff are continually monitored and improved to minimize production time while maintaining the highest standard of product quality..
MAIN QC PROCEDURE |
MAIN QC EQUIPMENT |
1. Mould Design Control |
1. CMM Machine |
2. Mould Steel Hardness Inspection |
2. Optical Projector |
3. Mould Electrodes Inspection |
|
4. Mould Core and Cavity Steel Dimension Inspection |
|
5. Mould Pre-Assembly Inspection |
6. Mould Trial Report and Samples Inspection |
7. Mould Pre-Shipment Final Inspection |
8. Export Mould Package Inspection |